- How do you choose MES software?
- Start from the problem you need to solve first, then judge vendors on four things besides the feature list: fit (will it be configured to how your plant runs, including older machines), integration (ERP, existing data, access for your own analysis), adoption (who configures it, who trains, will operators use it) and support after go-live (who you call, and whether they know your deployment). Ask to speak to a customer who has run the system for five years or more, because that shows whether the vendor kept up after the first year.
- OEE software vs MES vs CMMS: which should my plant invest in first?
- Start with the problem costing the most. If you don't know where production time is going, start with production reporting, OEE and downtime tracking. It is usually the fastest to show a return and produces the data the other decisions need. If customer complaints, audits or traceability requirements are the pressure, start with digital quality. If breakdowns and slow maintenance response are the pain, start with maintenance management. Standalone OEE software covers only the first, so prefer a platform where the others can be added later on the same data.
- What is the difference between MES, OEE software and a CMMS?
- OEE software measures how well equipment runs: availability, speed and quality. An MES covers the wider execution of production: counts, downtime, scrap, scheduling, operator workflows, and often quality checks and traceability. A CMMS manages maintenance: work orders, preventive maintenance, parts and equipment history. The three overlap around downtime, which is why sharing one set of data between them helps.
- Why do MES implementations fail?
- Usually for one of four reasons: the system was installed generically and never fit the plant's workflow, the ERP integration was only partly delivered, operators were trained before go-live and forgot, or the vendor left after go-live and nobody could adjust the system as the plant changed. Within a year people work around it instead of with it.
- Will we have to pay every time we want to change something?
- No. Once 10in6 is set up, your own team manages the day-to-day: operators, downtime and scrap codes, products and targets, shift schedules, scheduled checks, alerts, emailed reports and real-time boards (using the board builder). Showing your team how is part of go-live. Connecting new machines, adding modules or anything else that needs extra licensing, and custom reports come through 10in6. If you'd rather we made everyday changes for you, we can do that as a service, but you don't have to. Stackpole completed 75% of its rollout itself after training on a small set of checks.
- Can we build our own MES in-house instead?
- Some plants do, usually starting from spreadsheets or a custom database. It can work for a single report, but the ongoing cost is easy to underestimate: machine connectivity, handling lost communications and counter resets, operator screens, reporting, and someone who can maintain it when the original developer moves on. Compare the full cost over five years, not the first build.
- How long does an MES implementation take?
- It depends on scope. A focused first deployment, for example one line with operator screens and your downtime and scrap codes defined, can go live in two to four weeks. Multi-line rollouts typically take four to eight weeks, and ERP integration is usually the longest part. Be wary of any plan that goes live everywhere at once.