Manufacturing Software Case Studies — Real Plants. Real Results.
Detailed results from manufacturers who have implemented 10in6 — the specific challenges, the modules deployed, and the measurable outcomes achieved.
OEE Triples in 12 Months — From 20% to 58%
With no reliable visibility into where efficiency was lost, this plant deployed 10in6 across multiple lines with full PLC integration. OEE nearly tripled in the first year, metal waste went from 5% to 0% through real-time SPC alerting, and quality went fully paperless.
Unit Traceability, Error-Proofing, and OEE Gains Across Two Plants
Two Wisconsin plants went from paper tracking and manually produced reports to real-time dashboards, Andon escalation, and scan-to-pack serialized traceability — where labels only print once every component is scanned and final inspection is complete.
Read the full case study →"When we started using 10in6, OEE improved without any specific fixes — just putting the numbers out in front of operators enabled them to know where they were versus the production target."
Paperless Quality Checks Eliminate Hundreds of Thousands in Overpack Losses
The largest cheese cooperative in the U.S. digitized quality checks and giveaway tracking across two plants. Real-time weight alerts replaced paper checks written every 30 minutes — and gave management its first true view of overpack.
Read the full case study →"After moving quality checks to 10in6, it was the first time we had a good view of overpack. This one change has resulted in hundreds of thousands of dollars in savings."
Audit-Ready Quality and a 12-Year Partnership Across Nine Plants
The relationship started by replacing a costly equipment-monitoring system at four plants. Twelve years later, 10in6 runs in nine — with searchable quality history that turned nerve-racking OEM audits into a point of pride.
Read the full case study →"Before 10in6 customer audits were nerve-racking. Now we are proud to show our system, the detailed history we have available and the positive quality trends we are achieving."
Paperless Quality Lifts First Time Through from 72% to 83%
ISO quality checks moved from paper and manual control charts to the 10in6 Scheduled Tasks module with in-context electronic work instructions. Stackpole completed 75% of the rollout themselves after training on a small set of checks.
Read the full case study →"We're so close to the issues now that they can't hide. When we fix something, we quickly see an impact on our overall numbers."